4S Riverside Linh Dong Project (4S2) is located on the Sai Gon River, belonging to Road No. 30, Linh Dong Ward, branching with Saigon River, Go Dua River, Thanh Da - Binh Quoi section (opposite to the old Waterpark), opposite " The lungs of Thu Duc District ”- Tam Phu Park is 32ha wide.
As one of the projects with favorable transportation, Project 4S2 is approximately 15 minutes from District 1 shopping center and 15 minutes from canoe; 10 minutes from Eastern bus station; 1km from Binh Quoi Tourist Area - Thanh Da. Especially, it only takes about 15 minutes to reach Tan Son Nhat International Airport with the Tan Son Nhat - Binh Loi route. With a prime location, your life will become interesting with the facilities surrounding Project 4S2.
In this project, Lecmax is trusted to be selected as a contractor for the construction of fireproof doors, apartment doors, doors of technical rooms in this project.