0888 233 255 (HN)
0971 918 918 (HCM)
The National Assembly Building - a modern building with 5 floors, 2 basements, a total floor area of over 60,000 m2 - this is the workplace of the National Assembly, the highest authority of the people, is also the construction site. building the largest central office since the country was unified and is the work that requires modern technology and technology.
The Prime Minister asked the relevant units to continue to direct drastically and promptly complete the project's items as required, first of all to ensure the absolute safety of the work items, on fire prevention. fire fighting and other basic utilities and utilities such as sound, electrical systems, water, lighting, air conditioning, etc.
Lecmax is honored and proud to be one of the units that contributed a small part of its effort to perfect the National Assembly building. In this project, by the capacity, superior product quality, Lecmax has overcome many units in the industry to be selected as a contractor to supply and execute fireproof steel doors, technical doors in Underground Garage category.
The National Assembly House on Doc Lap Street (Ba Dinh District) is 39 m high, has a square architecture that has basically been completed to prepare for the 8th session, 13th National Assembly on October 20.